Compliance Reporting
made Simple.

Capture delivers the spatial data, documentation, and reporting that resource and infrastructure operators need to meet inspection obligations — across pipelines, utilities, forestry, dams, and more.

Remote Sensing Compliance Inspection Frameworks
NERC FAC-003-5Utility Vegetation Management
BC Mines Act / HSRCAnnual Reclamation Reporting
BCUC Mandatory Reliability StandardsTransmission Vegetation Control
CER Onshore Pipeline RegulationsRight-of-Way Corridor Monitoring
Alberta Pipeline ActAnnual Right-of-Way Inspection
Railway Safety Act (Transport Canada)Track Vegetation & Fire Safety
BC Forest & Range Practices Act (FRPA)Pre-Harvest Mapping & Reforestation
FireSmart / Industrial Wildfire Control PlanFuel Load Management
EPA NPDES / Construction General PermitStormwater Erosion Inspection
Clean Water Act §404 (US Army Corps)Wetland Delineation
FAA Part 77Airspace Obstruction Assessment
BC / AB Dam Safety RegulationStructural Dam Inspection
MSHA 30 CFR §77.216Tailings Impoundment Inspection
Crown Duty to Consult (Canada / UNDRIP)Spatial Footprint Documentation
ASCE 41 / FEMA 154Seismic Condition Assessment
NERC FAC-003-5Utility Vegetation Management
BC Mines Act / HSRCAnnual Reclamation Reporting
BCUC Mandatory Reliability StandardsTransmission Vegetation Control
CER Onshore Pipeline RegulationsRight-of-Way Corridor Monitoring
Alberta Pipeline ActAnnual Right-of-Way Inspection
Railway Safety Act (Transport Canada)Track Vegetation & Fire Safety
BC Forest & Range Practices Act (FRPA)Pre-Harvest Mapping & Reforestation
FireSmart / Industrial Wildfire Control PlanFuel Load Management
EPA NPDES / Construction General PermitStormwater Erosion Inspection
Clean Water Act §404 (US Army Corps)Wetland Delineation
FAA Part 77Airspace Obstruction Assessment
BC / AB Dam Safety RegulationStructural Dam Inspection
MSHA 30 CFR §77.216Tailings Impoundment Inspection
Crown Duty to Consult (Canada / UNDRIP)Spatial Footprint Documentation
ASCE 41 / FEMA 154Seismic Condition Assessment
LiDAR point cloud and aerial imagery — Capture

Intelligence

Comply faster with Spatial Data.

STEP 1 — DATA ACQUISITION

The right people and equipment, in the right place, before the campaign begins. Compliance work leaves no time for re-dos. We scope every project against its regulatory requirement, identifying what to measure and what level of accuracy the job requires. Sensor selection, crew placement, and ground control strategy are settled before we arrive on site. Every flight hour is working toward a defensible result.

STEP 2 — PROCESSING & ANALYSIS

Raw data becomes regulatory evidence. We classify and analyse every point cloud against the specific standard your project is subject to — whether that's MVCD clearances under FAC-003, reclamation stocking under the BC Mines Act, or fuel load mapping for a FireSmart assessment. You get structured, validated spatial data formatted for direct use in GIS, engineering, and asset management workflows.

STEP 3 — COMPLIANCE DELIVERABLES

Report-ready outputs your auditor will accept. Every engagement closes with a documented deliverable built to satisfy your regulator, not just your inbox. Spatial reports, change detection summaries, annotated maps, and compliance declarations — formatted to the submission standards of the applicable regulatory body. Scalable from a single site inspection to a multi-year corridor monitoring program.

AltaLens

Field Intelligence Software

Tell the Story of Progress

Map, annotate, and track aerial imagery across time.

Try for Free

7+

Years of commercial LiDAR
& other drone mapping experience

Reported Results

Real insights on every project.

BC · AB · SK

Engagements

Your terms.

We work on both project and retainer basis. Typical engagements range from single-site surveys to multi-phase programs requiring repeat campaigns and ongoing analysis.

All projects include a scoping call at no charge to confirm deliverable requirements before any commitment.

Get in Touch

Describe your project and the Capture team will respond within one business day.
No commitment needed until deliverables are agreed upon.